Global Energy Monitor

The Global Cement and Concrete Tracker (GCCT) provides information on global integrated and grinding plants, including all plants that have been proposed or under construction since 2018 and retired or mothballed since 2021. The GCCT provides asset-level data on location, ownership, operating status, annual clinker and cement capacity, and production methods including relevant green cement technology.

Integrated cement plants consist of multiple units, centered around kilns for clinker production and grinding mills to produce finished cement. Grinding plants consist only of grinding mills, with no clinker producing capacity. Clinker, the binding element of cement, is typically produced through coal- or oil-fueled combustion due to high heat requirements (1500°C), which necessitate the use of high-carbon fuels. The GCCT does not capture the historic capacity of all units that have been retired or mothballed within operating plants beyond the dates outlined above. Each plant included in the tracker is linked to a wiki page on GEM.wiki that provides additional details.

The most recent release of this data was in July 2025, and the GCCT map and underlying data will be updated annually. To learn about the various components of each GEM tracker, read About GEM’s Trackers. To receive notifications from this project, please sign up for our mailing list. If you have questions about this project, please contact the Project Manager, Joshua Clement.

167
countries/areas included
3515
cement plants tracked
5.5B
tonnes annual cement capacity
3.1B
tonnes annual clinker capacity

Summary Tables


Jinfeng Cement Plant, Changzhou, Jiangsu, China.
Map Data: Google, Image ©2025 Airbus, CNES/Airbus, Landsat/Copernicus, Maxar Technologies